Excavating The Basement

 

basement textWith the gravel and topsoil scraped and piled and the concrete steps (found under the side deck) split horizontally and pushed to the back yard (to save the trouble of landfilling) for a future fire pit we began excavation for the addition basement.

P1000215P1000217 textThese two pictures are taken from the same direction. Basement under LR in foreground.

 

P1000216 text

The picture to left is taken from where the future front door would be.  The Japanese Maple, out of frame to the right, was too big to move and, at $1,000.00 to replace, we were hoping to preserve it.  The excavation crew was great about understanding and working around it.

 

'ghost' and cut concrete blocks of removed pump room

‘ghost’ and cut concrete blocks of removed pump room

During excavation we came upon a small subterranean room, of poured and concrete blocks, which had been filled in with dirt.  Excavating it we found a pump and water heater shaped cistern which supplied the original kitchen with water.  The piping down to the water table was found intact.

cutting the well pump line

cutting the well pump line

P1000210

 

 

 

P1000212

 

 

 

 

 

The above pictures show the pump mechanism and the reservoir tank found during excavation.  The reservoir probably weighed about 200 lbs (90 kgs) because it took three of us to load it into the truck for drop off at the scrap dealers’.

 

Inside the existing basement….

Copyright (C), Multiple Listing Service of Long Island, Inc, 2004 Copyright (C), Multiple Listing Service of Long Island, Inc, 2004

 

 

 

 

….we stripped the walls down to the metal studs and removed the fiberglass batt insulation.  Throughout the insulation were little tunnels made by mice.  I only found three dead ones; don’t know where the others went.

The finished ceilings (drywall in the above left picture; mineral-fiber composite in the above right) had to be removed in order to jack-up the sloped floor above (below picture).  The existing steel I-beam ran under the wall between the kitchen and living room.  We jacked it up about 1-1/4″.  We raised another (wood) beam as far as the copper pipes would allow (about 3/4″).

P1000394

 

 

 

We excavated and poured concrete footings in the existing basement in preparation of new load bearing columns that would support the new second floor.

P1000310 textP1000317

 

 

 

P1000319P1000313

 

 

 

Of course, all these new footings ruined the finished floors.